20/01/2017 01:01:11
Presenting your attention the metal framework assembly for the construction of a new store near Riga. The metal was cleaned by shot-blasting machine and coated with a thin layer of soil, and then welding and re-ground treatment were conducted. The final stage in the workshop was the painting. At the appointed time the metal was successfully delivered to the object to the customer for installation, which was made by IDL Group specialists.